You don't have javascript enabled. Good luck with that.
Pencarian
embangunan Saluran Phb Selesai, Jalur Busway di Jl I Gusti Ngurah Rai Dibuka Siang Ini
....
photo Nurito - Beritajakarta.id

Transjakarta Lanes along Jalan I Gusti Ngurah Rai Reopened

It is reported that two Transjakarta lanes along Jalan I Gusti Ngurah Rai, Klender, East Jakarta have been reopened since 1 PM, Wednesday (1/12) after being closed due to construction of connecting and crossing channels from residential areas to connecting channel (phb) at location.

Construction work had been completed last night, and we decided to reopen these lanes

"Construction work had been completed last night, and we decided to reopen these lanes," said Drainage Development and Improvement Division Head, Tengku Saugi Zikri.

He explained, the excavated land at the site had been cleared since this morning. Currently, all work is done 100 percent," he stated.

I Gusti Ngurah Rai Regular Lanes Re-opened Tonight

As for the information, connecting and crossing channels are made to minimize flooding that usually hits RW 09 and 10 Klender. Those channels are connected to Tegal Amba connecting channel.

Linked News
Popular News indeks
  1. Duren Sawit PTSP Holds Door-to-Door Servies at Pondok Kelapa TPU until Thursday

    access_time15-05-2024 remove_red_eye726 personNurito
  2. Commission D: RDF Construction in Rorotan Has Many Benefits

    access_time13-05-2024 remove_red_eye614 personFolmer
  3. Aiming to Global City, Jakarta Prioritizes the Development of Environmentally Friendly Waste Processing

    access_time13-05-2024 remove_red_eye601 personFolmer
  4. 35 Toddlers in Kedoya Selatan Received Assistance with Nutritious Additional Food

    access_time13-05-2024 remove_red_eye566 personTP Moan Simanjuntak
  5. 42,878 Tourists Swarm Monas Area

    access_time12-05-2024 remove_red_eye401 personBudhi Firmansyah Surapati